PG&E Custom Panel Vault

San Fransisco, CA

Latest News

Case Study
bergelectric1_desat_sep

Mission Critical Fuel Supply for California Healthcare Facility’s Emergency Power System

Stockton, CA

Bergelectric Corporation, a nationally recognized electrical contractor, finished on-site construction of the “mission critical” electric power emergency/backup generation system for the new $700-million California Health Care Facility in Stockton, CA.

Bergelectric, responsible for feeding power to the 144-acre site, supplied the core support facilities that serve as the backbone of operations. One of the most significant aspects of Berg’s role on CHCF-Stockton was the integration of normal and emergency power.

Oldcastle Precast supplied the specialized fuel storage system that feeds the 2 Mega Watt Caterpillar generators for emergency power.

Read More

Events Calendar

30
MTWTFSS
27 28 29 30 1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
July 2016
MayJunJulAugSep