Special Post Tensioned Bridge Slabs Produced for Pine Basin Bridge Replacement

SWAN VALLEY, Idaho (AUGUST 2017) – Oldcastle Precast Idaho Falls teamed with Bonneville Power Administration, HK Contractors, and Bryant Greene Concrete to replace the bridge at the entrance to Pine Basin Camp in Swan Valley, Idaho. Condemned in the fall of 2016, this bridge serves as the only access to the popular boys and girls camp and a valuable access to many of the electrical systems running through the canyon serving Victor, Driggs and Swan Valley.

Read More

Download This Press Release

Click here to add to My Files.